How to complete the construction of the prefab steel warehouse on schedule?

Prefabricated Metal Buildings

It is a commitment to the owner to build a prefab steel warehouse within the specified period, but to ensure that this task can be completed, an excellent commander must be indispensable.

1. In the construction of prefab steel warehouse, the total construction period is the goal, and the phase control plan is used to ensure the effective conditions inside and outside the enterprise, and dynamic management is adopted to make the construction organization scientific and rational, and ensure that the plan is completed on schedule or ahead of schedule.

2. Fully prepare for the start of work.

prefab steel warehouse

3. Conscientiously do a good job in the joint review of steel structure warehouse drawings and solve the problems found in the technical disclosure to avoid delays in the construction period due to design changes. Timely preparation of practical construction organization design and main sub-item workshop warehouse construction operation design provides a reliable guarantee for continuous construction operations.

4. Hold a production scheduling meeting every day and check it day by day. If there is any delay, it will be solved in time by increasing the labor force. The company will coordinate and solve the problems in manpower, machinery, and material supply in a timely manner.

5. Last but not least, the communication and coordination between internal and external.